Wednesday, 2 December 2020

Bathroom remodel proper order

We are planning to remodel the second bath. It has pink plastic fake tile panels on the walls and as a tub/shower surround. Those will be removed , the surround will be tiled, and the walls will have beadboard 3/4 of the way up. The water supply valves and the fixtures for the tub/shower will be replaced as well. Also replacing vanity, keeping the tub and toilet. There is easy access to the water pipes, valves etc through the large linen closet that backs up to the shower wall. I have...

Bathroom remodel proper order


No comments:

Post a Comment