Removed cast iron tub from an older home and a layer of top flooring which had seen better days.
Left with a sub floor 9" wide tongue and grove 3/4" at 45 degrees to the joists that are nailed.
I'm tempted to put screws beside the nails as the nails seem to be working out. I have cut 32"
lengths from 12" wide x 3/4" which I intend to lay across and fasten to the sub floor. Over this
I am going to install my membrane (1/4" hardie backer board) over the floor and up the walls.
Then drop in...
Installing shower base floor
Left with a sub floor 9" wide tongue and grove 3/4" at 45 degrees to the joists that are nailed.
I'm tempted to put screws beside the nails as the nails seem to be working out. I have cut 32"
lengths from 12" wide x 3/4" which I intend to lay across and fasten to the sub floor. Over this
I am going to install my membrane (1/4" hardie backer board) over the floor and up the walls.
Then drop in...