Thursday, 10 June 2021

Basement Waterproofing a Basement that has Structural Clay Walls Using Weep Holes

I ran a tight string along the middle at fender height (my tiller has fenders). I then cut a path the width of my tiller, removed the excess soil, then sloped the sides with tiller by swaying it sideways. Took two days. It's about 100' long, 12' wide. About 2 cubic yards of soil removed. Photo taken while standing in the ditch.

source https://www.inspectorsjournal.com/topic/18931-basement-waterproofing-a-basement-that-has-structural-clay-walls-using-weep-holes/?do=findComment&comment=172785

No comments:

Post a Comment