Tuesday, 29 June 2021

Inherited a hot mess!

Took over a rehab and the electric piece seems to be straight up screwed. May or may not matter but let me preface by saying the home was originally wired aluminum. The service panel (Siemens) was replaced and inspected and it "appears" numerous legs were added/replaced with copper but most everything "in-wall" is still ALR.

When I took over nothing was labeled and all of the switches/outlets were gone but they did have 80% of the boxes pigtailed out with AlumiConn connectors.

So here is...

Inherited a hot mess!


No comments:

Post a Comment